MESYUARAT JAWATANKUASA TEKNIKAL OSC
PERBADANAN PUTRAJAYA

MESYUARAT JAWATANKUASA TEKNIKAL OSC, PERBADANAN PUTRAJAYA
TAJUK MESYUARAT |
: | MESYUARAT JAWATANKUASA TEKNIKAL PUSAT SETEMPAT (JKT OSC) BIL. 14/2020 |
TARIKH |
: | 4 SEPTEMBER 2020 (JUMAAT) |
MASA |
: | 9:30 AM |
TEMPAT |
: | BILIK MESYUARAT TANJUNG, ARAS 9, KOMPLEKS PERBADANAN PUTRAJAYA |
PENGERUSI |
: | DATO' FADLUN BIN MAK UJUD |
AGENDA MESYUARAT
1 |
KATA ALU-ALUAN PENGERUSI BERSAMA JAWATANKUASA TEKNIKAL OSC |
2 |
MINIT MESYUARAT JAWATANKUASA TEKNIKAL PUSAT SETEMPAT (JKT OSC) BIL. 13/2020 PADA 07-08-2020 |
3 |
SENARAI KERTAS PEMBENTANGAN |
4 |
PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN |
5 |
HAL-HAL LAIN |
Kertas Pembentangan
A. PERMOHONAN SERENTAK
| ||||||||||
CADANGAN MEMBINA SEBUAH BANGLO 2 TINGKAT DIATAS LOT NO. 2324, JALAN P15 H4/5, PRESINT 15, PUTRAJAYA UNTUK YBHG. TAN SRI DATO SERI DR. ZULKIFELI BIN MOHD ZIN | ||||||||||
Oleh | ||||||||||
ARKITEK AZIMI
SYNERGY NETWORK | ||||||||||
| ||||||||
CADANGAN MEMBINA SEBUAH BANGLO 2 TINGKAT DIATAS LOT 111 (PT 12049), JALAN P10B/5, PRESINT 10, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK EN. PAISAL B. HUSSIN & PN. MALIZA BT MAWARDI | ||||||||
Oleh | ||||||||
FATARONI MS ARCHITECT
JURUTERA PERUNDING BUDI TEGUH | ||||||||
B. PERMOHONAN KEBENARAN MERANCANG PELAN SUSUN ATUR
| ||||||
PERMOHONAN KEBENARAN MERANCANG BAGI PINDAAN PELAN SUSUN ATUR PRESINT 16 YANG TELAH DILULUSKAN (RUJ. NO. PELAN: PPJ/R/R/1A-P16/1H(1/1) YANG MELIBATKAN PINDAAN KE ATAS LOT 76, PRESINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ORANGEBEAM DEVELOPMENT SDN. BHD. | ||||||
Oleh | ||||||
URBAN SCALE STUDIO SDN. BHD. | ||||||
C. PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN
| ||||
PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN SISTEM KAMERA LITAR TERTUTUP (CCTV) DAN PANIC BUTTON DI PRESINT 1, PRESINT 2, PRESINT 3, PRESINT 4, PRESINT 5, PRESINT 7, PRESINT 8, PRESINT 9, PRESINT 11, PRESINT 12, PRESINT 13, PRESINT 14, PRESINT 19 DAN PRESINT 20, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PERBADANAN PUTRAJAYA. | ||||
Oleh | ||||
TURBINE TECHNIQUE SDN. BHD. | ||||
| ||||||
PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN BAGI CADANGAN PEMBINAAN RAMP/FLYOVER SEPANJANG 300 METER DARI JALAN P15H KE PERSIARAN TIMUR BAGI TUJUAN PENYURAIAN TRAFIK UNTUK JABATAN KERJA RAYA | ||||||
Oleh | ||||||
JABATAN KERJA RAYA | ||||||
D. PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN
| ||||||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI PEMBINAAN SATU STESEN GAS ASLI TAMBAHAN (GAS STATION NO 2) BAGI PEMBANGUNAN 1504 UNIT PERUMAHAN AWAM MALAYSIA (PPAM) DI ATAS LOT 10005, PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PERBADANAN PUTRAJAYA | ||||||
Oleh | ||||||
JURUTERA EDC SDN. BHD. | ||||||
| ||||
PERMOHONAN KELULUSAN PELAN PINDAAN MENDIRIKAN BANGUNAN (KALI-1) BAGI CADANGAN PEMBANGUNAN PERUMAHAN YANG MENGANDUNGI DUA (2) BLOK PANGSAPURI KOS SEDERHANA 16 TINGKAT DAN 17 TINGKAT (463 UNIT), TEMPAT LETAK KERETA 3 TINGKAT DAN KEMUDAHAN SOKONGAN DI ATAS PT. 4284 (ZON 7C) DAN KERJA-KERJA MENAIKTARAF SEBAHAGIAN KAWASAN HIJAU DAN ZON PENAMPAN, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOMES SDN. BHD. | ||||
Oleh | ||||
NANIZAIN ARCHITECT | ||||
| ||||
PERMOHONAN KELULUSAN PELAN PINDAAN MENDIRIKAN BANGUNAN BAGI CADANGAN MEMBINA RUMAH SSESEBUAH 2 TINGKAT DI ATAS LOT H.S (D) 2398 PT 2845, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUAN AININ BINTI SULAIMAN | ||||
Oleh | ||||
ARKITEK MOHD HAYAZI AGUSI | ||||
| ||||
PERMOHONAN KELULUSAN LANUTAN PELAN MENDIRIKAN BANGUNAN BAGI CADANGAN MEMBINA SESEBUAH RUMAH 2 TINGKAT BERSERTA GARAJ SUB-BASEMENT DIATAS LOT PT NO 15177, JALAN P14B, PRESINT 14, PUTRAJAYA, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK YBHG.
DATUK SERI SARIPUDDIN B.HJ KASIM & YBHG. DATIN SERI ZURAINA BT. WAN HANIFF | ||||
Oleh | ||||
LINEA ARCHITECT SDN. BHD. | ||||
E. PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAH SUAI BAGI CADANGAN TAMBAHAN LALUAN RAMP, TAMBAHAN STOR DAN TANDAS OKU DI TINGKAT 2 DI SURAU AR-RAHIM, PRESINT 15, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
SAMHAN ARCHITECT | ||
| ||||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAH SUAI BAGI CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL DI LOT INDUSTRI KECIL 11/ 2 TINGKAT YANG SEDIADA KEPADA KEDAI PEMASANG SKRIN PELEKAT KERETA DI NO. 17, PT 9074, DI JALAN INDUSTRI PUTRA 1, TAMAN RIMBA ALAM, PRESINT 14, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK DOUBLE R AUTOZONE | ||||
Oleh | ||||
AZRAI ARCHITECT | ||||
|
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN BANGUNAN KEDAI DI ATAS LOT 16 (PT9049) & 18 (PT9050), JALAN INDUSTRI PUTRA 1, KAWASAN INDUSTRI, OFF JALAN P14J, PRESINT 14, 62250 PUTRAJAYA DAN NO. 41 (PT9048), JALAN INDUSTRI PUTRA 1, PRESINT 14, 62000 WILAYAH PERSEKUTUAN PUTRAJAYA |
Oleh |
LARAS ARCHITECTS SDN. BHD. |
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI BAGI PENGGANTIAN PAIP MINYAK UNTUK STESEN MINYAK SEDIADA DI ATAS PT 3352 DI ALAMAT NO LOT PT 3352, JALAN P11A, PRESINT 11,
62150 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PETRONAS DAGANGAN BERHAD | ||
Oleh | ||
ZAINUDDIN DESIGN | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI SEBUAH RUMAH TERES 21/2 TINGKAT YANG SEDIADA DI NO.12, (PT. 8155), JALAN CENDANA P14/11, PRESINT 14, 62050, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUAN SHARIFAH AZLINA BINTI SYED ANUAR DAN
ENCIK ABD RAHIM BIN ABD HAMID | ||
Oleh | ||
ARKITEK ADAM HALIM | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI KEPADA RUMAH BERKEMBAR 2 1/2 TINGKAT SEDIADA DI ATAS PT 14577, NO.1, JALAN MURRAYA P12/2, PRESINT 12, 62150 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ENCIK MUNAWAR BIN DATUK AB HAMID | ||
Oleh | ||
ZAINUDDIN DESIGN | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL KEPADA
SEBUAH RUMAHSESEBUAH DUA TINGKAT YANG SEDIADA DI NO. 1, (PT 14803), JALAN P16A, D’SURIA PRESINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ISWARABENA SDN. BHD. | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI CADANGAN TAMBAHAN DAN PERUBAHAN RUMAH TERES 3 TINGKAT
YANG SEDIA ADA DI NO. 12, JALAN CENDANA P14/7, PRESINT 14, 62000 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ENCIK ZEFRI BIN ABU HASSAN | ||
Oleh | ||
YPTAN ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI KEPADA SEBUAH RUMAH TERES 2 TINGKAT YANG SEDIADA DI
NO. 17 (PT 3271) JALAN 11A 1/1, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ENCIK ZAINAL ABIDIN BIN YAHAYA DAN PUAN SHARIFAH ZALIHA BINTI SYED WAZIR | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAH SUAI KEPADA RUMAH TERES 2 TINGKAT YANG SEDIADA DI NO. 29, PT 5507,
JALAN P11D/14, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUAN ZARINAH BINTI MAT JAILAINI | ||
Oleh | ||
REKABINA R4U SDN. BHD. | ||
F. PERMOHONAN KELULUSAN PERMIT KERJA MALAM
| ||||
PERMOHONAN KELULUSAN PERMIT KERJA MALAM BAGI CADANGAN PEMBANGUNAN 29 TINGKAT BANGUNAN PANGSAPURI PERKHIDMATAN BESERTA 5 TINGKAT PODIUM DAN 2 TINGKAT BASMEN (458 UNIT) DI ATAS SEBAHAGIAN PLOT 5PP6, PRESINT 5, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK NADI CERGAS DEVELOPMENT SDN. BHD. | ||||
Oleh | ||||
NADI CERGAS DEVELOPMENT SDN. BHD. | ||||
G. PERMOHONAN KELULUSAN PERMIT-PERMIT KERJA
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI PERMOHONAN KERJA DIJALAN BAGI PROJEK KEJURUTERAAN, PEROLEHAN, PEMBINAAN, PENTAULIAHAN DAN NAIK TARAF STESEN MEMETER SEDIA ADA FASA 5 '19 PRESINT 9, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
HAMMER ENGINEERING SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI PERMOHONAN KERJA DIJALAN BAGI PROJEK KEJURUTERAAN, PEROLEHAN, PEMBINAAN, PENTAULIAHAN DAN NAIK TARAF STESEN MEMETER SEDIA ADA FASA 5 '19 PRESINT 9, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
HAMMER ENGINEERING SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT KERJA MALAM BAGI PERMOHONAN KERJA DIJALAN BAGI PROJEK KEJURUTERAAN, PEROLEHAN, PEMBINAAN, PENTAULIAHAN DAN NAIK TARAF STESEN MEMETER SEDIA ADA FASA 5 '19 PRESINT 9, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
HAMMER ENGINEERING SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA MEMBAIKPULIH LOOP DETECTOR DI WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
MERCU EFEKTIF ENTERPRISE | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI KERJA-KERJA MEMBAIKPULIH LOOP DETECTOR DI WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
MERCU EFEKTIF ENTERPRISE | ||
| ||
PERMOHONAN LANJUTAN KELULUSAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA PENYELENGGARAAN LAMPU AWAM DI ZON 3, UNTUK TEMPOH ENAM (6) BULAN, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
MKZ MUKMIN RESOURCES | ||
| ||
PERMOHONAN KELULUSAN PERMIT LALUAN LOGISTIK BAGI KERJA-KERJA PEMBAIKAN SALURAN DAN TEMBOK UNTUK MENGGUNAKAN JALAN
DI DALAM WETLAND PUTRAJAYA | ||
Oleh | ||
MICRO CONSTRUCTIONS SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI CADANGAN PEMBANGUNAN UNTUK KAWASAN PERUMAHAN 39 UNIT RUMAH TERES
3 TINGKAT, DI ATAS LOT 17, 18, 19, 21, 23, 25, 27, 77 HINGGA 90, SEBAHAGIAN REZAB PARIT, SEBAHAGIAN REZAB JALAN BESERTA PROMENAD, JALAN P16, PRESINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
WOG GLOBAL RESOURCES SDN. BHD. | ||
| ||
PERMOHONAN LANJUTAN PERMIT KERJA DI JALAN CADANGAN MEMPERBAIKI, MENJALANKAN UJIAN TEKANAN DAN PENTAULIAHAN (TESTING AND COMMISSIONING) SALURAN PAIP GAS ASLI BAWAH TANAH DI ZONE 9B, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
WOG GLOBAL RESOURCES. SDN BHD. | ||
| ||
PERMOHONAN KELULUSAN LANJUTAN PERMIT LALUAN LOGISTIK BAGI CADANGAN PEMBINAAN TALIAN PENGHANTARAN 275KV T-OFF SERDANG-SALAK TINGGI KE SERDANG EAST DI WILAYAH PERSEKUTUAN PUTRAJAYA | ||
Oleh | ||
BRAS VENTURES BERHAD | ||
H. KERTAS TAMBAHAN
| ||||
PERMOHONAN KELULUSAN LANDSKAP BAGI CADANGAN MEMBINA DAN MENYIAPKAN KERJA-KERJA JALAN UTAMA, PERPARITAN, UTILITI DAN LANDSKAP BAGI PRESINT 19 (ZON SELATAN), WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOLDINGS SDN. BHD. | ||||
Oleh | ||||
SKA LANDSCAPE ARCHITECTS | ||||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL DI TINGKAT SATU KEDAI/PEJABAT TIGA TINGKAT YANG SEDIA ADA KEPADA PUSAT PEMBELAJARAN DI NO. 20A (PT 11592) JALAN PAHANG P15, PRESINT 15, PUTRAJAYA UNTUK ALNOOR FOUNDATION | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN RUMAH SESEBUAH 2 TINGKAT TERMASUK RUMAH PENGAWAL DI ATAS LOT 37, JALAN P16B/2, PRESINT 16, 62100 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK YBHG. DATO’ SRI NORAZMAN BIN AYOB | ||
Oleh | ||
MAG ARCHITECT SDN BHD | ||
I. KERTAS MAKLUMAN
J. HAL-HAL LAIN
| ||
PERMOHONAN RAYUAN FI BERGANDA BAGI KELULUSAN PINDAAN MENDIRIKAN BANGUNAN CADANGAN PINDAAN KEPADA PELAN YANG TELAH DILULUSKAN RUJUKAN; PPJ/PER/KBKB/2014/P17-155, BERTARIKH
06 APRIL 2015, BAGI PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 800 UNIT PEMBANGUNAN PERUMAHAN PENJAWAT AWAM MALAYSIA (PPAM) BERSERTA KEMUDAHAN SOKONGAN DI ATAS PLOT 17RM2 ( PT 14065 ) SELUAS 8.21 EKAR, PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOLDINGS SDN. BHD. | ||
Oleh | ||
NEUFORMATION ARKITEK SDN. BHD. | ||