MESYUARAT JAWATANKUASA TEKNIKAL OSC
PERBADANAN PUTRAJAYA

MESYUARAT JAWATANKUASA TEKNIKAL OSC, PERBADANAN PUTRAJAYA
TAJUK MESYUARAT |
: | MESYUARAT JAWATANKUASA TEKNIKAL PUSAT SETEMPAT (JKT OSC) BIL. 8/2018 |
TARIKH |
: | 4 APRIL 2018 (RABU) |
MASA |
: | 2:30 PM |
TEMPAT |
: | BILIK MESYUARAT TANJUNG, ARAS 9, KOMPLEKS PERBADANAN PUTRAJAYA |
PENGERUSI |
: | DATO' FADLUN BIN MAK UJUD |
AGENDA MESYUARAT
1 |
KATA ALU-ALUAN PENGERUSI BERSAMA JAWATANKUASA TEKNIKAL OSC |
2 |
MINIT MESYUARAT JAWATANKUASA KUASA TEKNIKAL (JKT OSC) BIL. 7/2018 PADA 14-03-2018 |
3 |
PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN |
4 |
HAL-HAL LAIN |
Kertas Pembentangan
A. PERMOHONAN SERENTAK
| ||||||
CADANGAN PERUMAHAN PENJAWAT AWAM 1 MALAYSIA (PPA1M) YANG MENGANDUNGI: 1. 2 BLOK PANGSAPURI (811 UNIT) 2. 1 BANGUNAN TEMPAT LETAK KERETA 7 TINGKAT 3. KEMUDAHAN BERKAITAN SEPERTI DEWAN SERBAGUNA, PENCAWANG ELEKTRIK, TADIKA/TASKA, KEDAI, KAFETARIA, DOBI, RUMAH SAMPAH DAN PEJABAT PENGURUSAN DI ATAS PLOT 19RK1, PRESINT 19, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK GN HOMELAND SDN. BHD. | ||||||
Oleh | ||||||
ICN PLANNING CONSULT
LEYU PARTNERS SDN BHD | ||||||
| ||||||||||||||||||
CADANGAN PEMBANGUNAN PANGSAPURI AWAM 16 TINGKAT YANG MENGANDUNGI 192 UNIT KEDIAMAN BESERTA PODIUM TEMPAT LETAK KERETA 4 TINGKAT DAN KEMUDAHAN BERKAITAN DI ATAS PT 15174 (PLOT P14-14), PRESINT 14, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOMES SDN. BHD. | ||||||||||||||||||
Oleh | ||||||||||||||||||
IKTISAS PLANNERS SDN. BHD.
DOMAINE ARCHITECTS SDN. BHD. IKTISAS INGENIEURS SDN. BHD. | ||||||||||||||||||
| ||||||||||||||||
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH RUMAH KEDIAMAN 2 TINGKAT DI ATAS LOT 412, PRESINT 10, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK YBHG. TAN SRI MOHD KHALID BIN MOHD YUNUS. | ||||||||||||||||
Oleh | ||||||||||||||||
ARKITEK ICB SDN. BHD.
SKAZ CONSULTANCY | ||||||||||||||||
| ||||||||||||||||
CADANGAN PEMBANGUNAN SEBUAH RUMAH BANGLO 1 TINGKAT DI ATAS LOT P.T 1191, NO. 1, JALAN P10 C/6, PRESINT 10, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ENCIK RAGUNATHA NAICKER A/L ELUMALAI DAN PUAN SHOBA RANI RAGUNATHA NAICKER. | ||||||||||||||||
Oleh | ||||||||||||||||
ABDULLAH SHAHDAN ARCHITECT
QISTINA CONSULTANT | ||||||||||||||||
| ||||||||
CADANGAN BAGI MENDIRIKAN MONOPOLE SETINGGI 24M UNTUK TUJUAN KEMUDAHAN INTERNET TANPA WAYAR '1 BESTARINET' BAGI KEMENTERIAN PENDIDIKAN MALAYSIA DI KAWASAN SEKOLAH SULTAN ALAM SHAH (SMBP), PARCEL G, PRESINT 1, 62520 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK YTL COMMUNICATIONS SDN. BHD. | ||||||||
Oleh | ||||||||
TNO & ASSOCIATES SDN. BHD., | ||||||||
B. PERMOHONAN KEBENARAN MERANCANG PELAN SUSUN ATUR
| ||||
PERMOHONAN KEBENARAN MERANCANG PINDAAN SUSUNATUR BAGI TUJUAN PECAH SEMPADAN TANAH DI BAWAH SEKSYEN 135 KANUN TANAH NEGARA BAGI CADANGAN PEMBANGUNAN 35 UNIT INDUSTRI PERKHIDMATAN RINGAN 2 TINGKAT, 1 UNIT MEDAN SELERA DAN 1 UNIT PENCAWANG ELEKTRIK PADAT DI ATAS PLOT 4704, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA RESOURCES SDN. BHD. | ||||
Oleh | ||||
KW ASSOCIATE PLANNERS SDN. BHD. | ||||
C. PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN
| ||||
PERMOHONAN KEBENARAN MERANCANG BAGI PENDIRIAN BANGUNAN KE ATAS CADANGAN PEMBANGUNAN 968 UNIT RUMAH MAMPU MILIK WILAYAH PERSEKUTUAN (RUMAWIP) YANG MENGANDUNGI 2 BLOK PANGSAPURI 29 TINGKAT, 1 BLOK PODIUM TEMPAT LETAK KERETA BESERTA KEMUDAHAN DEWAN SERBAGUNA, PEJABAT PENGURUSAN, TADIKA DAN LAIN-LAIN KEMUDAHAN SOKONGAN DI ATAS PLOT P19RM1, PRESINT 19, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOMES SDN. BHD. | ||||
Oleh | ||||
SW PLANNING CONSULTANTS SDN. BHD. | ||||
D. PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL
| ||||
PERMOHONAN KEBENARAN MERANCANG PERUBAHAN MATERIAL BAGI TADIKA DI NO. 2, P9G1/5, PRESINT 9, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TADIKA TEE ZEE FOKUS. | ||||
Oleh | ||||
PUAN CHE FUZIAH BINTI DAUD | ||||
E. PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN
| ||||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN SEBUAH STESYEN MRT LALUAN 2 (SSP) YANG MENGANDUNGI BANGUNAN STESYEN 3 TINGKAT DAN BANGUNAN UTILITI DI ATAS SEBAHAGIAN LOT P.T 14187, P.T 14188 DAN TANAH KERAJAAN, PRESINT 7, PUTRAJAYA UNTUK MASS RAPID TRANSIT CORPORATION SDN. BHD. | ||||
Oleh | ||||
MONOSIST ARCHITECTS & ENGINEERS SDN. BHD. | ||||
| ||||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN PUSAT TAHFIZ YANG MENGANDUNGI 3 BLOK BANGUNAN 3 TINGKAT DAN 1 BUAH SURAU DI ATAS LOT 18P12, PRESINT 18, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PERBADANAN PUTRAJAYA. | ||||
Oleh | ||||
Z&SR ARCHITECTURAL VENTURES SDN. BHD. | ||||
F. PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI SEBUAH KEDAI SEDIA ADA DI TINGKAT SATU KEDAI/PEJABAT DUA TINGKAT YANG SEDIA ADA KEPADA SEBUAH PEJABAT PENGURUSAN DI NO.5A (PT.14092), JALAN P11E/5, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK QURANIC GENERATION TEAM. | ||
Oleh | ||
ARKITEK KAMSIAH | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN MENAMBAH SEBUAH TANGGA KECEMASAN DI BAHAGIAN BELAKANG DI TINGKAT SATU KEDAI/PEJABAT DUA TINGKAT YANG SEDIA ADA KEPADA TADIKA DI NO. 82A (P.T 11677), JALAN DIPLOMATIK, PRESINT 15, WILAYAH PUTRAJAYA UNTUK RYANS SPECIAL NEEDS CARE CENTRE. | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL DI TINGKAT ARAS TANAH KEDAI/PEJABAT 2 TINGKAT YANG SEDIA ADA KEPADA FARMASI DI NO. 82 (P.T 11677), JALAN DIPLOMATIK, PRESINT 15, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ALL DAY PHARMACY SDN. BHD. | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI TUJUAN TAMBAHAN DAN PERUBAHAN DI ARAS 2, LOT KOMERSIAL 4 TINGKAT SEDIA ADA KEPADA SEBUAH PEJABAT DI NO. LOT D-2-8 (PT 2805), AYER@8, PRECINT 8, 62250 WLAYAH PERSEKUTUAN PUTRAJAYA UNTUK THUNDER MATCH TECHNOLOGY SDN. BHD. | ||
Oleh | ||
JAZLAN AZMI ARCHITECTS SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI TUJUAN TAMBAHAN DAN PERUBAHAN DI ARAS 2, LOT KOMERSIAL 3 TINGKAT SEDIA ADA KEPADA SEBUAH PEJABAT DI NO. LOT B2-LG-5 (P.T 2805), AYER@8, PRECINT 8, 62250 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK RAKYAT TRAVEL SDN. BHD. | ||
Oleh | ||
JAZLAN AZMI ARCHITECTS SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH LOT PERNIAGAAN SEDIA ADA KEPADA PEJABAT DI NO. R12, KOMPLEKS PERBADANAN PUTRAJAYA, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK THZ TOURS SDN. BHD. | ||
Oleh | ||
SATEERAH ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN DI TINGKAT SATU KEDAI PEJABAT 2 TINGKAT YANG SEDIA ADA KEPADA SEBUAH POLIKLINIK DI NO. 9 (P.T 13370) DAN NO. 11 (P.T 13360), FASA 8C3, JALAN P8G/1, PRESINT 8, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK POLIKLINIK CAHAYA SDN. BHD. | ||
Oleh | ||
ARKITEK KAMSIAH | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH RESTORAN DI ATAS LOT NO. LG30 DI TINGKAT BAWAH PUSAT MEMBELI-BELAH ALAMANDA, PRESINT 1, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK SEPIRING CAFé SDN. BHD. | ||
Oleh | ||
ZAP GROUP ARCHITECTS SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN SEBUAH KEDAI PAKAIAN DI ATAS LOT NO. G60, G61, G62, G63, G64 & G65, TINGKAT BAWAH, PUSAT MEMBELI-BELAH ALAMANDA , PRESINT 1, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
ZAP GROUP ATRCHITECTS SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN DI TINGKAT BAWAH KEDAI PEJABAT 2 TINGKAT YANG SEDIA ADA KEPADA RESTORAN DI NO. 58 (P.T 11615), JALAN PERAK, PRESINT 15, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK MOHD CHAN SIGNATURE SDN. BHD. | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN DI TINGKAT BAWAH KEDAI PEJABAT 4 TINGKAT YANG SEDIA ADA KEPADA PASARAYA PAKAIAN DI NO. 67G, P.T 11499, JALAN DIPLOMATIK, PRESINT 15, PUTRAJAYA UNTUK PASARAYA MU SDN. BHD. | ||
Oleh | ||
ENCIK HAIRUDDIN BIN DAUD | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN BAGI LALUAN SEMENTARA DI TINGKAT SATU DI ANTARA LOT NO. 6A (P.T 11493) DAN NO. LOT 4A (P.T 11494), JALAN DIPLOMATIK 3/1, PRESINT 15, PUTRAJAYA UNTUK KAFA AL-AMIN ENTERPRISE. | ||
Oleh | ||
ARKITEK MOHD ALJEFRI | ||
| ||||
PERMOHONAN PELAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 1/2 TINGKAT DI NO.3, PT 1264 JALAN P9B 1/5, PRESINT 9, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||||
Oleh | ||||
ARKITEK MOHD ALJEFRI | ||||
G. PERMOHONAN KELULUSAN PERMIT-PERMIT KERJA
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA PENYELENGGARAAN LANDSKAP JALAN-JALAN PROTOKOL, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
MADANI RESOURCES SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA TIE IN GAS UNDERGROUND MAIN LINE FROM EXISTING PIPELINE TO GAS MALAYSIA LOW PRESSURE LINE AT PRECINCT 14-11, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
ALPHA FLOWTECH SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH PUSAT ANAK PERMATA NEGARA (PAPN) DI ATAS LOT PT 14887, JALAN P11F, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
SURIA INSAN RESOURCES SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI CADANGAN KERJA-KERJA PEMANTAUAN DAN PENYELENGGARAAN JALAN RAYA DAN PERABOT-PERABOT JALAN SECARA KOMPRIHENSIF DI PRESINT 7 - 17, PERSIARAN UTARA, PERSIARAN SERI PERDANA, LEBUH PERDANA TIMUR, LEBUH PERDANA SELATAN, LEBUH PERDANA BARAT, LEBUH SAUJANA DAN LEBUH SENTOSA, LINGKARAN PUTRAJAYA, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
HAKITA ENGINEERING | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI MENAIKTARAF MAINHOLE PAIP KUMBAHAN DI PLOT P.T 11995, JALAN P10B/8, PRECINCT 10, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
NEWWIN CONSTRUCTION & SERVICES | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI MENAIKTARAF MAINHOLE PAIP KUMBAHAN DI JALAN P10B/8, PRECINCT 10, PUTRAJAYA. | ||
Oleh | ||
NEWWIN CONSTRUCTION & SERVICES | ||
| ||
PERMOHONAN BAGI KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI KERJA MEMASANG DAN MEMBAIKI ‘EXTERNAL WATERPROOFING SEALANT’ DI BANGUNAN PIHAK BERKUASA PENERBANGAN AWAM MALAYSIA (CAMM) DAN KEMENTERIAN SUMBER ASLI DAN ALAM SEKITAR, PUTRAJAYA. | ||
Oleh | ||
GUMI ASLI ELEKTRIKAL SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG UNTUK KERJA MELETAKAN BAHAN DALAM KAWASAN RIZAB JALAN, MENUTUP LORONG/JALAN DAN LALUAN LOGISTIC BAGI MEMBAIKI DAN MENGGANTIKAN CERMIN KACA YANG PECAH DI BANGUNAN SURUHAHJAYA TENAGA, PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
SURUHANJAYA TENAGA | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI MELAKUKAN KERJA-KERJA PEMBAIKAN PAIP HYDRANT DI BANGUNAN BAHAGIAN HAL EHWAL UNDANG-UNDANG (BHEUU) 3G1, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
RANTAU ARAU SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI PEMBINAAN PAIP SESALUR KABEL TAMBAHAN TNB DAN MEMBAIK PULIH KEROSAKAN PAIP SESALUR KABEL TNB DI JALAN PRESINT 9 KE PRESINT 11, PUTRAJAYA. | ||
Oleh | ||
ABINA TEKNIK SERVICES | ||
| ||
PERMOHONAN PERMIT ANGKUT BAHAN BAGI CADANGAN PEMBANGUNAN 3 BLOK PANGSAPURI DAN 2 BLOK KONDOVILLA BERJUMLAH 360 UNIT DAN SEBUAH PUSAT REKREASI DI ATAS LOT P.T 1829, PRESINT 8 , WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
TSR BINA SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI CADANGAN REKA BENTUK, PEMBINAAN DAN PENYIAPAN BANGUNAN PEJABAT KERAJAAN TERDIRI DARIPADA MENARA PEJABAT DAN KERJA LUARAN PARCEL F, PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN, PRESINT 1, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
SUNWAY CONSTRUCTION SDN. BHD. | ||
| ||
PERMOHONAN BAGI KELULUSAN PERMIT TUTUP LORONG JALAN DAN MELETAK BAHAN BAGI MEMBAIKPULIH PAPAN TANDA DI BANGUNAN DORSETT, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
GL SIGN SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA MERENTANG KABEL 240 TRIPLEX DARI PPU 7, PRESINT 11 KE SEKOLAH AGAMA PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
AKLI (MALAYSIA) SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI PROJEK SISTEM PENGAGIHAN GAS ASLI KE PUTRAJAYA DL STAGE 4/17, PRESINT 1 DAN PRESINT 2, PUTRAJAYA. | ||
Oleh | ||
A.I TOTAL ENGINEERING SDN. BHD. | ||
| ||
THE PROPOSED CONSTRUCTION AND COMPLETION OF PUBLIC RESIDENTIAL DEVELOPMENT OF 8 UNITS SEMI D-DETACHED PUBLIC HOUSES AT ZONE 9B, PRECINCT 11, PUTRAJAYA. | ||
Oleh | ||
URITEC TEAM (M) SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI CADANGAN PEMASANGAN KHEMAH PROGRAM PERASMIAN KEDAI DAN PRODUK, DI ATAS JALAN PERAK, PRESINT 15, 62050 WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
PUAN NOR HAIZAN BINTI NASIR | ||
| ||
PERMOHONAN BAGI KELULUSAN PERMIT KERJA DI JALAN UNTUK KERJA-KERJA PENYELENGGARAAN CCTV CAMERA C-RAN PUTRAJAYA. | ||
Oleh | ||
VADS LYFE SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI CADANGAN PROJEK PEMBINAAN DAN PENYIAPAN 3 BLOK 20 TINGKAT (1062 UNIT) (PPA1M) DI ATAS PT. 12960 DI PLOT 5R5, PRESINT 5, WILAYAH PERSEKUTUAN PUTRAJAYA. | ||
Oleh | ||
PEMBINAAN MITRAJAYA SDN. BHD. | ||
| ||
EPCC OF NGDS TO PUTRAJAYA DL STAGE 4/17 (PARCEL F P1 OFFICE) PUTRAJAYA. | ||
Oleh | ||
A.I TOTAL ENGINEERING SDN. BHD. | ||
H. KERTAS TAMBAHAN
| ||||
PERMOHONAN KELULUSAN PELAN KERJA LAMPU JALAN DAN LAMPU ISYARAT BAGI CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI:-
A) 1 BLOK SERVIS APARTMENT 37 TINGKAT (439 UNIT) B) 1 BLOK SERVIS APARTMENT 26 TINGKAT (307 UNIT) C) 5 TINGKAT KEDAI/RUANG PERNIAGAAN (249 UNIT) D) 1 TINGKAT KEMUDAHAN AMENITI DI TINGKAT 3 E) 3 TINGKAT BESMEN TEMPAT LETAK KERETA DI ATAS LOT 5 (PLOT Z5), LOT 6 (PLOT Z6),LOT 7 (PLOT Z7), DAN LOT 8 (PLOT Z8), PRESINT 1, PUTRAJAYA UNTUK TETUAN PEDOMAN PURNAMA SDN BHD. | ||||
Oleh | ||||
EAB CONSULTING ENGINEERS SDN. BHD. | ||||
| ||||
PERMOHONAN KELULUSAN PELAN KERJA LAMPU JALAN DAN LAMPU ISYARAT BAGI CADANGAN PEMBANGUNAN UNTUK 1100 UNIT PERUMAHAN PENJAWAT AWAM 1 MALAYSIA (PPA1M SADERI) YANG TERDIRI DARIPADA:
1. 2 BLOK PANGSAPURI 23 TINGKAT 2. 1 BLOK BANGUNAN TEMPAT LETAK KERETA BERTINGKAT 7 TINGKAT BESERTA 1 TINGKAT DEWAN SERBAGUNADAN 4 UNIT PENCAWANG ELEKTRIK (DOUBLE CHAMBER) 3. SEBUAH TADIKA/TASKA 2 TINGKAT 4. 1 UNIT PENCAWANG TNB (DOUBLE CHAMBER) 5. 2 UNIT RUMAH SAMPAH 6. 1 UNIT NATURAL GAS KOMPARTMENT 7. 3 UNIT GAZEBO DAN LAIN-LAIN KEMUDAHAN DI ATAS PLOT16-R1, (P.T 12217) PERSINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PERBADANAN PUTRAJAYA | ||||
Oleh | ||||
JURUTERA PERUNDING GEN SDN. BHD. | ||||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL KEPADA RUMAH TERES TIGA TINGKAT YANG SEDIADA DI NO. 11, P.T 8078, JALAN CHENDANA P14/7, PRESINT 14, PUTRAJAYA UNTUK EN. SHAFIK BIN ABU HASSAN DAN PN. NORLIZA BINTI ABD. KARIM | ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI OLEH PEMILIK BAGI CADANGAN RUMAH KEDIAMAN NO. 8, JALAN 14 1/3, PRESINT 14, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK EN. SHIL ALAYUDIN BIN MOHD ALI SATAR. | ||
Oleh | ||
EN. SHIK ALAYUDIN BIN MOHAMMAD ALI SATAR | ||
I. HAL-HAL LAIN
| ||||
CADANGAN PEMBANGUNAN 1504 UNIT PERUMAHAN PENJAWAT AWAM 1MALAYSIA (PPA1M) DI ATAS LOT 10005, PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PERBADANAN PUTRAJAYA. | ||||
Oleh | ||||
KUMPULAN SENIREKA SDN. BHD. | ||||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI SEBUAH RUMAH BERKEMBAR 2 TINGKAT SEDIA ADA DI NO.16 (PT.9508), JALAN P15H 2/1, PRESINT 15, PUTRAJAYA UNTUK EN. AHMAD ZAMRI BIN KHAIRUDDIN
- PERMOHONAN LANJUTAN KELULUSAN YANG TELAH TAMAT TEMPOH. | ||
Oleh | ||
AZRAI ARKITEK | ||