MESYUARAT JAWATANKUASA TEKNIKAL OSC
PERBADANAN PUTRAJAYA
MESYUARAT JAWATANKUASA TEKNIKAL OSC, PERBADANAN PUTRAJAYA
TAJUK MESYUARAT |
: | MESYUARAT JAWATANKUASA TEKNIKAL PUSAT SETEMPAT (JKT OSC) BIL. 7/2019 |
TARIKH |
: | 25 APRIL 2019 (KHAMIS) |
MASA |
: | 2:30 PM |
TEMPAT |
: | BILIK MESYUARAT TANJUNG, ARAS 9, KOMPLEKS PERBADANAN PUTRAJAYA |
PENGERUSI |
: | DATO' FADLUN BIN MAK UJUD |
AGENDA MESYUARAT
1 |
KATA ALU-ALUAN PENGERUSI BERSAMA JAWATANKUASA TEKNIKAL OSC |
2 |
MINIT MESYUARAT JAWATANKUASA TEKNIKAL PUSAT SETEMPAT (JKT OSC) BIL 6/2019 PADA 10-04-2019 |
3 |
PEMBENTANGAN PERMOHONAN UNTUK KELULUSAN |
4 |
HAL-HAL LAIN |
Kertas Pembentangan
A. PERMOHONAN KEBENARAN MERANCANG PENDIRIAN BANGUNAN
B. PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN
| ||||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 2 BLOK KONDOMINIUM 18 TINGKAT (338 UNIT) BESERTA KEMUDAHAN DAN 1 BLOK TEMPAT LETAK KERETA 5.5 TINGKAT DI ATAS ZON 8A (FASA 1B), PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOMES SDN. BHD. | ||||
| ||||
Oleh | ||||
T.R. HAMZAH & YEANG SDN BHD | ||||
| ||||
PERMOHONAN KELULUSAN PELAN PINDAAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 4 BLOK KONDOMINIUM 18 TINGKAT (676 UNIT), KEMUDAHAN AWAM, SURAU DAN 2 BLOK TEMPAT LETAK KERETA 5.5 TINGKAT KEPADA:
I. FASA 1A - 2 BLOK KONDOMINIUM (BLOK A&B) 18 TINGKAT (338 UNIT) BESERTA KEMUDAHAN AWAM, SURAU DAN 1 BLOK TEMPAT LETAK KERETA 5.5 TINGKAT, II. MENGELUARKAN FASA 1B - 2 BLOK KONDOMINIUM (BLOK C&D) 18 TINGKAT (338 UNIT) BESERTA KEMUDAHAN, SURAU DAN 1 BLOK TEMPAT LETAK KERETA 5.5 TINGKAT, DI ATAS ZON 8A (FASA 1B), PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA HOMES SDN. BHD. | ||||
| ||||
Oleh | ||||
T.R. HAMZAH & YEANG SDN BHD | ||||
| ||||
PERMOHONAN KELULUSAN PELAN PINDAAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN 4 BLOK KONDOMINIUM YANG MENGANDUNGI 324 UNIT RUMAH DAN KEMUDAHAN BERKAITAN DI ATAS PT 14064 (PLOT 17RP3), PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA
HOMES SDN. BHD. | ||||
| ||||
Oleh | ||||
RIZAL OSMAN ARCHITECT | ||||
| ||||
PERMOHONAN KELULUSAN MENDIRIKAN BANGUNAN BAGI CADANGAN PEMBANGUNAN SEBUAH RUMAH SESEBUAH 2 TINGKAT DI ATAS LOT PT 4571, JALAN P11 B1/3, PRESINT 11, 62300 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK EN. OTHMAN BIN ABDULLAH DAN PN. SITI JURIANI BINTI JALALUDDIN | ||||
| ||||
Oleh | ||||
NEA ARCHITECTS PARTNERSHIP | ||||
C. PERMOHONAN KELULUSAN PELAN KERJA JALAN DAN PERPARITAN
| ||||
PERMOHONAN KELULUSAN PELAN KERJA JALAN DAN PERPARITAN BAGI CADANGAN STESEN MRT2 (SSP) YANG MENGANDUNGI: I.SEBUAH BANGUNAN STESEN MRT 3 TINGKAT (STN36:PUTRAJAYA SENTRAL) II. SEBUAH BANGUNAN UTILITI III.SEBUAH BANGUNAN PINTU MASUK 'A' DI ATAS SEBAHAGIAN LOT PT14187, PT 14188 DAN TANAH KERAJAAN PRESINT 7, WILAYAH PERSEKUTUAN PUTRAJAYA, UNTUK MASS RAPID TRANSIT CORPORATION SDN. BHD | ||||
| ||||
Oleh | ||||
KHAIRI CONSULT SDN. BHD. | ||||
D. PERMOHONAN KELULUSAN PELAN LANDSKAP
| ||||
PERMOHONAN KELULUSAN LANDSKAP BAGI CADANGAN PEMBANGUNAN 4 BLOK KONDOMINIUM YANG MENGANDUNGI 324 UNIT RUMAH DAN KEMUDAHAN BERKAITAN DI ATAS LOT PT 14064(PLOT 17RP3), PRESINT 17, WILAYAH PERSEKUTUAN PUTRAJAYA, UNTUK TETUAN PUTRAJAYA HOMES SDN. BHD. | ||||
| ||||
Oleh | ||||
EURODESIGN SDN BHD | ||||
| ||||
PERMOHONAN KELULUSAN LANDSKAP BAGI CADANGAN PEMBANGUNAN 86 UNIT RUMAH TERES 3 TINGKAT DI ATAS PT 12929 {PLOT 5R8), DAN MENAIKTARAF TAMAN PENGHUBUNG DI ATAS PLOT 12930 PRESINT 5, WILAYAH PERSEKUTUAN UNTUK TENTUAN PUTRAJAYA HOMES SDN.BHD | ||||
| ||||
Oleh | ||||
QAZ DESIGN SDN BHD | ||||
E. PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI
| ||
PERMOHONAN KELULUSAN KERJA KECIL UBAHSUAI BAGI PREMIS NO.9 JALAN INDUSTRI PUTRA 1, PRESINT 14, PUTRAJAYA KEPADA KEDAI CUCI KERETA DAN SPA KERETA (AUTO DETAILING) UNTUK FIRMA ZELAN GLORY AUTO DETAILING. | ||
| ||
Oleh | ||
ZAILAN BINTI MOHD ISA | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAH SUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN KEPADA ‘DHL SERVICE POINT’, DI LOT B-G-01, TOWER B, SUASANA PJH, 2C5, PERSIARAN BARAT, PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK ANGGUN QASEH LESTARI SDN. BHD. | ||
| ||
Oleh | ||
SUHAILAWATI BINTI KAMARUZZAMAN | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI TUJUAN TAMBAHAN DAN PERUBAHAN DI ARAS G, LOT KOMERSIAL 3 TINGKAT SEDIADA DI NO. 2A, (PT 10001), JALAN P15H, PRECINT 15, 62250 PUTRAJAYA
UNTUK : JUNAIDAH BINTI MOHD. SAID | ||
| ||
Oleh | ||
JAZLAN AZMI ARCHITECTS SDN BHD | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI TUJUAN TAMBAHAN DAN PERUBAHAN DI ARAS G HINGGA ARAS 2, RUMAH BERKEMBAR 3 TINGKAT SEDIADA KEPADA SEBUAH PUSAT PERKEMBANGAN MINDA KANAK-KANAK DI NO. LOT 37 (PT 13280) & 38 (PT 13281), JALAN P8 E2/5, PRECINT 8, 62250 PUTRAJAYA
UNTUK : GENIUS AULAD INTERNATIONAL GROUP SDN. BHD. | ||
| ||
Oleh | ||
JAZLAN AZMI ARCHITECTS SDN BHD | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN MEMBINA TAMBAHAN BINAAN SEMENTARA DINDING SESEKAT (PARTITION) KEPADA RUANG NIAGA BERALAMAT DI ATAS LOT D-G-5, AYER@8, JALAN P8G, 8C1, PRESINT 8, 62250 PUTRAJAYA UNTUK MINHAKIM TRAVELS SDN. BHD | ||
| ||
Oleh | ||
SHAARI JAMALUDIN ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI
CADANGAN TAMBAHAN DAN KERJA-KERJA KECIL DI TINGKAT DI TINGKAT BAWAH KEDAI PEJABAT 3 TINGKAT YANG SEDIA ADA KEPADA KEDAI KELENGKAPAN HAIWAN PELIHARAAN DI NO. 44, PT 11622, JALAN PERAK P15, PRESINT 15, PUTRAJAYA UNTUK TETUAN: KITTY MEOW MEOW PET MART | ||
| ||
Oleh | ||
AZRAI ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAIBAGI CADANGAN REKABENTUK DALAMAN PUSAT REFLEKSOLOGI
DI ATAS LOT OG-08, GROUND FLOORSURIA MALL, NO.1 ,PERSIARAN TUN ABDUL RAZAK,PRESINT 3,62000 PUTRAJAYA UNTUK AMNA FOOT REFLEXOLOGY | ||
| ||
Oleh | ||
PDA ARCHITECTS SDN BHD | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN DI TINGKAT BAWAH DAN TINGKAT 1 UNTUK CAWANGAN BANK KEPADA BANGUNAN KEDAI PEJABAT 2 TINGKAT SEDIA ADA DI NO. 25-25A (PT. 13362), TINGKAT BAWAH DAN TINGKAT 1, JALAN P8 G, PRESINT 8, PUTRAJAYA UNTUK: KOPERASI BANK PERSATUAN MALAYSIA BERHAD | ||
| ||
Oleh | ||
ZAINUDDIN DESIGN | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI RUMAH BERKEMBAR 2 1/2 TINGKAT SEDIADA DI ATAS PT 12732,HS(D) 8816, NO.11, JALAN P18H 1/2, PRESINT 18,BANDAR PUTRAJAYA, DAERAH PUTRAJAYA, WILAYAH PERSEKUTUAN PUTRAJAYA.
UNTUK : IBRAHIM ABDULLA DIDI | ||
| ||
Oleh | ||
CP ARCHITECT | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 1/2 TINGKAT YANG SEDIADA DI NO. 7, PT 12670, JALAN P18H 1/9, PRESINT 18, PUTRAJAYA.
UNTUK SAYED AZMAN BIN SAYED HUSSIN & SHARIFAH SALMA BINTI SYED | ||
| ||
Oleh | ||
REKABINA R4U SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 1/2 TINGKAT YANG SEDIADA DI NO. 1, PT 12737, JALAN P18H 1/2, PRESINT 18, PUTRAJAYA.
UNTUK KAMALIAH BINTI MOHAMAD NOH | ||
| ||
Oleh | ||
REKABINA R4U SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 ½ TINGKAT YANG SEDIADA DI NO.58, PT 13503, JALAN KUNYIT EMAS P16/2, PRESINT 16, PUTRAJAYA.
UNTUK TETUAN: FOO SIEW CHIN & DAVID JOHN MARS | ||
| ||
Oleh | ||
REKABINA R4U SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PELAN KERJA-KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 ½ TINGKAT YANG SEDIADA DI NO. 5, PT 12630, JALAN P18H ¼, , PRESINT 18, PUTRAJAYA.
UNTUK TETUAN: MUHAMMAD HAFIZ BIN SALEH | ||
| ||
Oleh | ||
REKABINA R4U SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN KERJA-KERJA KECIL DAN UBAHSUAI BAGI CADANGAN TAMBAHAN DAN PERUBAHAN DI NO. 28, JALAN P9B1/15, PRESINT 9, PUTRAJAYA UNTUK DORE RAJA A/L M. RAGAVAN. | ||
| ||
Oleh | ||
EN. DORE RAJA A/L M RAGAVAN | ||
F. PERMOHONAN KELULUSAN PERMIT-PERMIT KERJA
| ||
PERMOHONAN PERMIT LALUAN LOGISTIK BAGI PROJEK MAINHEAD A: PROPOSED 275KV/132KV QUAD CIRCUIT TRANSMISSION LINE FROM NATIONAL UNIVERSITY (NUNI TO SERDANG EAST (SRDE).
- LALUAN KELUAR MASUK BAGI KERJA MENAIKTARAF TALIAN PENCAWANG MASUK UTAMA SEDANG EAST DI PERSIARAN PERSEKUTUAN | ||
| ||
Oleh | ||
TENAGA NASIONAL BERHAD | ||
| ||
PERMOHONAN PERMIT KERJA TUTUP LORONG/JALAN DAN MELETAK BAHAN BAGI KERJA-KERJA PENUKARAN CERMIN LUAR BANGUNAN MENARA PRISMA, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA MENUTUP SEBAHAGIAN JALAN KEMERDEKAAN BAGI PENUKARAN CERMIN BANGUNAN MENGGUNAKAN KREN | ||
| ||
Oleh | ||
ASM VENTURES | ||
| ||
PERMOHONAN PERMIT KERJA TUTUP LORONG/JALAN DAN MELETAK BAHAN BAGI KERJA-KERJA PENUKARAN CERMIN LUAR BANGUNAN MENARA PRISMA, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA MENUTUP SEBAHAGIAN JALAN KEMERDEKAAN BAGI PENUKARAN CERMIN BANGUNAN MENGGUNAKAN KREN | ||
| ||
Oleh | ||
ASM VENTURES | ||
| ||
PERMOHONAN PERMIT KERJA TUTUP LORONG/JALAN DAN MELETAK BAHAN BAGI KERJA-KERJA PENUKARAN CERMIN LUAR BANGUNAN MENARA PRISMA, PRESINT 3, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA MENUTUP SEBAHAGIAN JALAN KEMERDEKAAN BAGI PENUKARAN CERMIN BANGUNAN MENGGUNAKAN KREN | ||
| ||
Oleh | ||
ASM VENTURES | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA PERLAKSANAAN KAJI SELIDIK TAPAK (SITE SURVEY) PROJEK ADVANCED METERING INFRASTRUCTURE (AMI) TNB DI SEKITAR PUTRAJAYA.
- KERJA-KERJA MELETAKKAN SKYLIFT DI ATAS JALAN | ||
| ||
Oleh | ||
RESPONTRADE SDN BHD | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA MSVT MEMECAH BEBAN BAGI VENDOR FEEDER PANJANG ANTARA PPU PTJ 2 VCB 3 DAN 6 DENGAN PPU PTJ 5 VCB 5 DAN 6, PRESINT 11, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA-KERJA MERENTANG KABEL VOLTAN TINGGI DI JALAN P11 | ||
| ||
Oleh | ||
ALI CONSTRUCTION SDN BHD | ||
| ||
PERMOHONAN PERMIT UNTUK MELETAKKAN BAHAN DALAM KAWASAN RIZAB JALAN, MENUTUP LORONG/JALAN DAN LALUAN LOGISTIK DI SURUHANJAYA TENAGA, PRESINT 2, PUTRAJAYA.
- PENUTUPAN SEBAHAGIAN JALAN DI SEKELILING BANGUNAN SURUHANJAYA TENAGA BAGI MENGGANTIKAN PANEL KACA YANG PECAH | ||
| ||
Oleh | ||
ZULKHAIRI BIN ALIAS | ||
| ||
PERMOHONAN PERMIT UNTUK MELETAKKAN BAHAN DALAM KAWASAN RIZAB JALAN, MENUTUP LORONG/JALAN DAN LALUAN LOGISTIK DI SURUHANJAYA TENAGA, PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA.
- PENUTUPAN SEBAHAGIAN JALAN DISEKELILING BANGUNAN SURUHANJAYA TENAGA BAGI MENGGANTIKAN PANEL KACA YANG PECAH | ||
| ||
Oleh | ||
ZULKHAIRI BIN ALIAS | ||
| ||
PERMOHONAN LANJUTAN PERMIT KERJA ANGKUT BAHAN BAGI CADANGAN PEMBANGUNAN UNTUK KAWASAN PERUMAHAN 39 UNIT RUMAH TERES 3 TINGKAT, DI ATAS LOT 17, 18, 19, 21, 23, 25, 27, 77 HINGGA 90, SEBAHAGIAN REZAB PARIT, SEBAHAGIAN REZAB JALAN BESERTA PROMENAD, JALAN P16, PRESINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA.
- PEMBUANGAN TANAH KE PRESINT 19 | ||
| ||
Oleh | ||
WZR PROPERTY SDN BHD | ||
| ||
PERMOHONAN LANJUTAN PERMIT ANGKUT BAHAN BAGI THE PROPOSED CONSTRUCTION AND COMPLETION OF 2 BLOCKS OF OFFICE BUILDINGS, RETAILS SPACES AND EXTERNAL WORKS ON PLOTS Z1 AND Z2, 3 LEVELS OF BASEMENT PARKING AND ACCESS ROAD ON PLOTS Z1, Z2, Z3 AND Z4,;AND UPGRADING WORKS TO JALAN ALAMANDA WITH ASSOCIATED INFRASTRUCTURES AND LANDSCAPING WORKS AT PRECINCT 1, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA-KERJA PEMBUANGAN TANAH KE PRESINT 19. | ||
| ||
Oleh | ||
AHMAD ZAKI SDN. BHD. | ||
| ||
PERMOHONAN LANJUTAN PERMIT KERJA TUTUP LORONG/JALAN BAGI KERJA-KERJA UPGRADING WORKS TO JALAN ALAMANDA WITH ASOCIATED INFRASTRUCTURES AND LANDSCAPING WORKS AT PRECINT 1, WILAYAH PERSEKUTUAN, PUTRAJAYA.
- KERJA-KERJA PERLEBARAN JALAN DAN PENAMBAHBAIKAN INFRA SERTA LANDSKAP DI JALAN ALAMANDA | ||
| ||
Oleh | ||
AHMAD ZAKI SDN. BHD. | ||
| ||
PERMOHONAN LANJUTAN KELULUSAN PERMIT KERJA DI JALAN BAGI CADANGAN KERJA TAPAK DIPERSIMPANGAN P1J5 UNTUK KERJA-KERJA PENYENGGARAAN SISTEM LAMPU ISYARAT (ITACA) SERTA KERJA-KERJA BERKAITAN DI PUSAT PENGURUSAN BANDAR RAYA, TALIAN FIBER OPTIK DAN PAPAN TANDA GATEWAY WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TEMPOH SATU (1) TAHUN, PRESINT 1, WILAYAH PERSEKUTUAN PUTRAJAYA.
- PENGOREKAN JALAN BAGI PENYAMBUNGAN KABEL LAMPU ISYARAT P1J5 | ||
| ||
Oleh | ||
GLOBAL VIEW ENGINEERING SDN BHD | ||
| ||
PEMOHONAN PERMIT KERJA DIJALAN BAGI CADANGAN PEMBANGUNAN 363 UNIT KONDOMINIUM 35 TINGKAT BERSERTA KOLAM RENANG SERTA 1 BLOK RUMAH KELAB 3 TINGKAT (KEMUDAHAN AMENITI) 4 TINGKAT PODIUM SERTA 1 TINGKAT ARAS BAWAH TANAH TEMPAT LETAK KERETA DI ATAS PT 14124 (SELUAS 4.452 EKAR), PRESINT 15, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK SETIA PUTRAJAYA DEVELOPMENT SDN. BHD.
- PENAMBAHAN PEMASANGAN ‘INTERLOCKING PAVER’ BAGI JALAN KELUAR MASUK | ||
| ||
Oleh | ||
GLOBAL VIEW ENGINEERING SDN. BHD. | ||
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI PEMASANGAN KABEL FIBER OPTIK UNTUK 2 UNIT CCTV UNTUK CADANGAN PEMBANGUNAN KOMPLEKS KERAJAAN PARCEL F, PRESINT 1, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK PUTRAJAYA BINA SDN. BHD.
- KERJA PENGOREKAN BAGI PENYAMBUNGAN KABEL FIBER CCTV | ||
| ||
Oleh | ||
SUNWAY CONSTRUCTION SDN BHD | ||
| ||
PERMOHONAN KELULUSAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA MEMBAIKPULIH KEROSAKAN PAIP SESALUR KABEL 33KV & 11KV DI JALAN P7A, PRESINT 7, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KOREKAN SECARA HDD DAN KOREKAN TERBUKA | ||
| ||
Oleh | ||
GRAND TEKNIK BINA SDN BHD | ||
| ||
PERMOHONAN LANJUTAN KELULUSAN PERMIT KERJA DI JALAN BAGI CADANGAN PEMBANGUNAN PENCAWANG ELEKTRIK PEMBAHAGIAN UTAMA 33KV DAN KERJA-KERJA BERKAITAN DI ATAS SEBAHAGIAN PLOT 8C7, PRESINT 8, WILAYAH PERSEKUTUAN PUTRAJAYA.
- KERJA-KERJA PEMBINAAN JALAN KELUAR MASUK DAN SISTEM PERPARITAN | ||
| ||
Oleh | ||
GRAND TEKNIK BINA SDN. BHD. | ||
| ||
PERMOHONAN PERMIT KERJA TUTUP LORONG/JALAN DAN MELETAK BAHAN BAGI KERJA-KERJA MELETAKKAN SKYLIFT DI PRESINT 3,
WILAYAH PERSEKUTUAN PUTRAJAYA. - KERJA MENUTUP JALAN P3F UNTUK MELETAKKAN SKYLIFT BAGI KERJA-KERJA TELEKOMUNIKASI 5G | ||
| ||
Oleh | ||
IFORTE TECHNOLOGIES | ||
| ||
PERMOHONAN PERMIT KERJA TUTUP LORONG/JALAN DAN MELETAK BAHAN BAGI KEGUNAAN LORI ANGKUT (30 TAN) UNTUK MENGANGKUT DAN MEMINDAHKAN KONKRIT DARIPADA LUAR MASUK KE DALAM KOMPLEKS JABATAN PERDANA MENTERI, PRESINT 2 WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK TUJUAN PEMBANGUNAN TAPAK CHILLER. | ||
| ||
Oleh | ||
SNAB FOCUS SDN BHD | ||
| ||
PERMOHONAN PERMIT TUTUP JALAN/LORONG DI ALAMAT NO.44, JALAN P8B/5, PRESINT 8, WILAYAH PERSEKUTUAN PUTRAJAYA.
- PENUTUPAN JALAN BAGI PEMASANGAN KHEMAH UNTUK ACARA KERAIAN | ||
| ||
Oleh | ||
ALMIRULITA BT MOHD YUSOFF | ||
| ||
PERMOHONAN PERMIT KERJA DI JALAN BAGI KERJA-KERJA PENYELENGGARAAN LANDSKAP JALAN-JALAN PROTOKOL, WILAYAH PERSEKUTUAN PUTRAJAYA SECARA RUNDINGAN TERUS.
- KERJA-KERJA PENUTUPAN SEBAHAGIAN JALAN BAGI KERJA PENYELENGGARAAN LANDSKAP | ||
| ||
Oleh | ||
MADANI RESOURCES SDN BHD | ||
|
PERMOHONAN LANJUTAN PERMIT KERJA ANGKUT BAHAN BAGI CADANGAN PEMBANGUNAN UNTUK KAWASAN PERUMAHAN 39 UNIT RUMAH TERES 3 TINGKAT DI ATAS LOT 17, 18, 19, 21, 23, 25, 27, 77 HINGGA 90, SEBAHAGIAN REZAB PARIT, SEBAHAGIAN REZAB JALAN BESERTA PROMENAD, JALAN P16, PRESINT 16, WILAYAH PERSEKUTUAN PUTRAJAYA.
- PEMBUANGAN TANAH KE PRESINT 19 |
Oleh |
WZR PROPERTY SDN BHD |
| ||
PERMOHONAN LANJUTAN KELULUSAN PERMIT TUTUP JALAN/LORONG BAGI CADANGAN MELETAK KREN DI ATAS JALAN TUN HUSSEIN DAN JALAN P2R, PRESINT 2, WILAYAH PERSEKUTUAN PUTRAJAYA.
- LANJUTAN KERJA TUTUP JALAN/LORONG UNTUK MELETAKAN KREN DI ATAS JALAN TUN HUSSEINBAGI TUJUAN PENUKARAN GEAR BOX COOLING TOWER. | ||
| ||
Oleh | ||
TRUWATER COOLING TOWERS SDN. BHD. | ||
G. KERTAS TAMBAHAN
| ||||
PERMOHONAN KELULUSAN PELAN KERJA TANAH AM/ASAS BAGI CADANGAN STESEN MRT LALUAN 2(SSP) YANG MENGANDUNGI:
IV. SEBUAH BANGUNAN STESEN MRT 3 TINGKAT (STN36: PUTRAJAYA SENTRAL) V. SEBUAH BANGUNAN UTILITI VI. SEBUAH BANGUNAN PINTU MASUK 'A' DI ATAS SEBAHAGIAN LOT PT14187, PT 14188 DAN TANAH KERAJAAN PRESINT 7, WILAYAH PERSEKUTUAN PUTRAJAYA UNTUK MASS RAPID TRANSIT CORPORATION SDN. BHD. | ||||
| ||||
Oleh | ||||
KHAIRI CONSULT SDN. BHD. | ||||
| ||||
PERMOHONAN KELULUSAN PELAN LAMPU JALAN BAGI CADANGAN PEMBANGUNAN 4 BLOK BANGUNAN PEJABAT (12-14 TINGKAT) DENGAN TEMPAT LETAK KERETA PARAS BESMEN (2 TINGKAT) DI ATAS SUB-PARCEL Z1, Z2, Z3 & Z4, PARCEL Z, (SEBAHAGIAN LOT PT 6) HS(D)6, PRECINCT 1, PUTRAJAYA, WILAYAH PERSEKUTUAN UNTUK TETUAN PUTRAJAYA HOLDINGS SDN BHD | ||||
| ||||
Oleh | ||||
PCR SDN BHD | ||||
| ||
PERMOHONAN KELULUSAN PELAN KERJA - KERJA KECIL DAN UBAHSUAI KEPADA RUMAH BERKEMBAR 2 1/2 TINGKAT SEDIADA DI ATAS PT 14751, NO.5, JALAN KESUM P16/4, PRESINT 16, 62150 PUTRAJAYA. WILAYAH PERSEKUTUAN PUTRAJAYA. UNTUK: EN. MD. MAZLAN BIN TAMYIS DAN PN. MAZNAH BINTI IBRAHIM | ||
| ||
Oleh | ||
ZAINUDDIN DESIGN | ||
H. HAL-HAL LAIN
| ||
PERMOHONAN SKIM KOMUNITI BERPENGAWAL DI DANAU MUTIARA, PRESINT 16, PUTRAJAYA UNTUK KOMUNITI DANAU MUTIARA.
- PERMOHONAN SKIM KOMUNITI BERPENGAWAL | ||
| ||
Oleh | ||
KOMUNITI DANAU MUTIARA | ||
| ||||
CADANGAN MENAIK TARAF ‘UTILITI BOX TELCO’ WILAYAH PERSEKUTUAN PUTRAJAYA | ||||
| ||||
Oleh | ||||
SEKSYEN REKABENTUK BANADAR DAN PERMIT SEMENTARA | ||||
| ||
CADANGAN KERJA-KERJA MELEBARKAN JALAN LINGKARAN GEMILANG SATU, PRESINT 4 SERTA LAIN-LAIN KERJA YANG BERKAITAN, WILAYAH PERSEKUTUAN PUTRAJAYA | ||
| ||
Oleh | ||
JABATAN KEJURUTERAAN DAN PENYELENGGARAAN | ||
| ||
CADANGAN MENAIK TARAF ‘UTILITI BOX TELCO’ WILAYAH PERSEKUTUAN PUTRAJAYA | ||
| ||
Oleh | ||
JABATAN LANDSKAP DAN TAMAN | ||
| ||||
PROJEK PUSAT PENYELENGGARAAN BOT, PRESINT 19 PUTRAJAYA
- PEMBENTANGAN STATUS PROJEK DAN PENGELUARAN CCC | ||||
| ||||
Oleh | ||||
TENAGA Z-L SDN BHD | ||||